PROJECTS COMPLETED |
Various High Voltage Audits
Various Protection / Fault Studies (Waterline Projects)
Project Engineer (November 2017 – Present) – Hay Point Services Rail Optimization Project (Cunning Engineering)
Project Engineer (September 2017 – October 2017) – Peak Downs Mine ROM Automation Improvement Project (M2E Services)
Project Engineer (June 2017 – August 2017) – SWC Braeside Pump Station Upgrade (M2E Services)
Project Engineer (May 2017) – Saraji Mine One Mile Dam Pump Station Upgrade (M2E Services)
Project / Commissioning Engineer (February 2017 – April 2017) – Glencore Collinsville Mine ROM MCC Upgrade (M2E Services)
Project Engineer (November 2016 – January 2017) – Blackwater Mine DRE41 Shutdown (M2E Services)
Design Engineer (August 2016 – September 2016) – Saraji Mine One Mile Dam Pump Station Upgrade (M2E Services)
Project Engineer / Project Manager (March 2016 – August 2016) – Hay Point SL1 PLC Upgrade (M2E Services)
Project Engineer / Project Manager (December 2014 – January 2016) – South Walker Creek MCC Relocation Works (M2E Services)
Project / Commissioning Engineer (October 2015 – November 2015) – Glencore Collinsville Mine CHPP MCC Upgrade (M2E Services)
Project / Commissioning Engineer (July 2015) – DBCT L5 / S1 Telemetry Upgrade (M2E Services)
Project / Commissioning Engineer (June 2015) – BMA Pump Station Upgrades – Bedford East / Bedford West No.1 / Bedford West No.2 / Selma (M2E Services)
Project Engineer (March 2015 – April 2015) – Dalrymple Bay Coal Terminal Substation SS3B Electrical Upgrade (M2E Services)
Design Engineer (January 2015 – February 2015) – DBCT 2ML Tank Design (Waterline Projects)
Project Engineer (August 2014 – December 2014) – Dalrymple Bay Coal Terminal Substation SS3B Electrical Upgrade (M2E Services)